![]() ![]() 32 traffic may use the new Clepper Lane off-ramp westbound S.R. Access to the south leg of GEW Road from S.R.32 East to Clepper Lane will be opened to traffic, and a new signal will be in operation at the end of the ramp to Clepper Lane. ![]() 32 traffic between Glen Este-Withamsville (GEW) Road and Elick Lane will be shifted to the outside in each direction. As a result of the project, at-grade intersections and three traffic signals within the project zone will be eliminated.ĭuring the spring and summer of 2023, the following traffic changes will be in effect: Other improvements include building a third, westbound lane on SR 32, between the new interchange and Glen Este-Withamsville Road, and realigning Bach Buxton Road between Marian Drive and Clepper Lane to the south of SR 32. As part of Segment IVA of the Eastern Corridor program, the SR 32/Bach Buxton interchange project will create a new, full-service diamond interchange along SR 32, immediately east of the existing Elick Lane intersection in the Eastgate area of Clermont County, by realigning and extending Bach Buxton Road over SR 32 and connecting with Old SR 74 on the north side. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |